SITE FILE · SERVICE 04 — STRUCTURAL STRENGTHENING
Core sample first,then reinforcement.
From performance analysis to carbon fiber — engineer-signed.
We take core samples and report the seismic performance. The strengthening design is engineer-signed, the build is under contract, and every stage comes with a photographed report.
You receive a written preliminary report after the survey.
- Scope in writing
- Schedule in writing
- Price in writing

BEBEK APARTMENT BUILDING — STRENGTHENING
ANALYSIS → CARBON FIBER · 2025
ANALYSIS → CARBON FIBER · 2025
240+ Projects
15+ Years
%98 Satisfaction
12+ Cities & Districts
Scale 1:50 — Every job under written contractFIELD REPORT · 02 — DELIVERABLES
Eight items,
one file.
EVERY ITEM IN A WRITTEN CONTRACT — SCOPE, SCHEDULE, PRICE.
- 01Core sampling & rebar scanning
- 02Seismic performance analysis
- 03Engineer-signed strengthening design
- 04Carbon fiber (FRP) application
- 05Column & beam jacketing
- 06Added shear walls
- 07Permit & municipality follow-up
- 08Itemized budget table
FIELD REPORT · 03 — PROCESS
Three steps, all in writing.
01
Analysis & Report
CORE SAMPLES ARE TAKEN, REBAR IS SCANNED, AND THE PERFORMANCE ANALYSIS IS REPORTED IN WRITING.
02
Design & Contract
ENGINEER-SIGNED STRENGTHENING DESIGN; SCOPE, SCHEDULE AND PRICE IN A SINGLE CONTRACT.
03
Build → Handover
CARBON FIBER, JACKETING, SHEAR WALLS. THE SITE IS REPORTED WEEKLY AND THE PERMIT FILE IS HANDED OVER.
FIELD REPORT · 04 — SELECTED WORK
Strengthened exactly as we reported.

BUILDING — 6 FLOORS · STRENGTHENED WHILE OCCUPIED

LISTED BUILDING — STRENGTHENING INTEGRATED
FIELD REPORT · 05 — CLIENT RECORDS
From the handover records.
RECORD 01 — BEBEK
"The building was strengthened without anyone moving out; unit-by-unit planning, daily cleanup, weekly reports. The engineering team answered every question in writing."
Mehmet Tunç
BUILDING STRENGTHENING
RECORD 02 — BEYKOZ
"Seeing the performance report made the decision easy. What was done and why was written out item by item in the project file."
Zeynep Ekinci
PERFORMANCE ANALYSIS + FRP
FIELD REPORT · 06 — SURVEY
Let's survey.
Measure, write.
You receive a written preliminary report after the survey.