Hausenlab
SITE FILE · SERVICE 03 — RESTORATION

We touch historic buildingswith a report in hand.

From as-built survey to board approval — documented, written restoration.

On a listed building, documents come before work: structural analysis, restoration design, the preservation board file. Every stage is photographed, archived and reported in writing.

You receive a written preliminary report after the survey.

  • Scope in writing
  • Schedule in writing
  • Price in writing
Restoration
BEYKOZ WATERFRONT MANSION — RESTORATION
BOARD APPROVED · 2024
240+ Projects
15+ Years
%98 Satisfaction
12+ Cities & Districts
FIELD REPORT · 02 — DELIVERABLES

Eight items, one file.

EVERY ITEM IN A WRITTEN CONTRACT — SCOPE, SCHEDULE, PRICE.

  • 01Structural & material analysis
  • 02As-built survey — existing condition drawings
  • 03Restitution & restoration design
  • 04Preservation board file & approval follow-up
  • 05Sourcing of original materials
  • 06Structural strengthening integration
  • 07Photographic process archive
  • 08Itemized budget table
FIELD REPORT · 03 — PROCESS

Three steps, all in writing.

01

Analysis & Survey

WE DOCUMENT THE BUILDING: MATERIAL ANALYSIS, DAMAGE ASSESSMENT, EXISTING CONDITION DRAWINGS.

02

Design & Board Approval

RESTITUTION AND RESTORATION DESIGNS ARE PREPARED; WE BUILD THE BOARD FILE, WE HANDLE THE FOLLOW-UP.

03

Build → Handover

WE WORK WITH ORIGINAL MATERIALS AND A PHOTOGRAPHIC ARCHIVE. THE HANDOVER FILE MATCHES THE BOARD RECORDS.

FIELD REPORT · 04 — SELECTED WORK

Delivered exactly as we documented them.

All projects
WATERFRONT MANSION RESTORATION — BEYKOZ · 2024
MANSION — LISTED · BOARD APPROVED
WATERFRONT MANSION RESTORATION — BEYKOZ · 2024
HISTORIC BUILDING STRENGTHENING — BEBEK · 2025
BUILDING — STRENGTHENING INTEGRATED
HISTORIC BUILDING STRENGTHENING — BEBEK · 2025
FIELD REPORT · 05 — CLIENT RECORDS

From the handover records.

RECORD 01 — BEYKOZ
"We handed over our family's waterfront mansion dreading the board process; they prepared the file and approval came through without a hitch. The original fabric was preserved one to one."
Nur Kandemir
MANSION RESTORATION
RECORD 02 — BEBEK
"Strengthening and restoration of our historic building ran in the same project. We received photographed reports every week; the archive file was in our hands at handover."
Kerem Soylu
HISTORIC BUILDING RESTORATION
FIELD REPORT · 06 — SURVEY

Let's survey.
Measure, write.

You receive a written preliminary report after the survey.