SITE FILE · SERVICE 02 — ELECTRICAL & MECHANICAL SYSTEMS

No cable without a diagram,no pipe without a plan.

Electrical, plumbing, heating, HVAC — one project, one contract.

We test the existing systems, engineer the project and hand over with certificates. Every line is mapped on the diagram; test and measurement results are documented in a written report.

You receive a written preliminary report after the survey.

  • Scope in writing
  • Schedule in writing
  • Price in writing
Electrical & Mechanical Systems
KADIKÖY APARTMENT BUILDING — MEP
DESIGN → TEST → CERTIFICATE · 2024
240+ Projects
15+ Years
%98 Satisfaction
12+ Cities & Districts
FIELD REPORT · 02 — DELIVERABLES

Eight items, one file.

EVERY ITEM IN A WRITTEN CONTRACT — SCOPE, SCHEDULE, PRICE.

  • 01Existing systems analysis & report
  • 02Electrical design & wiring diagram
  • 03Plumbing & heating plan
  • 04AC & ventilation design
  • 05Smart home infrastructure
  • 06Panel & breaker renewal
  • 07Test, measurement & certificate file
  • 08Itemized budget table
FIELD REPORT · 03 — PROCESS

Three steps, all in writing.

01

Survey & Testing

WE TEST THE EXISTING LINES ON SITE AND REPORT THE RISKS IN WRITING.

02

Design & Contract

WIRING DIAGRAM AND INSTALLATION PLAN ARE DRAWN. SCOPE, SCHEDULE AND PRICE IN A SINGLE CONTRACT.

03

Build → Test & Handover

LINES ARE INSTALLED, MEASURED, DOCUMENTED. THE CERTIFICATE FILE IS IN YOUR HANDS AT HANDOVER.

FIELD REPORT · 04 — SELECTED WORK

Delivered exactly as we diagrammed them.

All projects
ELECTRICAL & MECHANICAL RENEWAL — KADIKÖY · 2024
BUILDING — 12 UNITS · DELIVERY: 6 MONTHS
ELECTRICAL & MECHANICAL RENEWAL — KADIKÖY · 2024
FULL RENOVATION — ETİLER · 2025
APARTMENT — 4+1 · MEP + RENOVATION
FULL RENOVATION — ETİLER · 2025
FIELD REPORT · 05 — CLIENT RECORDS

From the handover records.

RECORD 01 — KADIKÖY
"The entire electrical system of a 40-year-old building was renewed; they planned it unit by unit and nobody was left without power. The test reports were handed over as a complete file."
Hakan Yıldız
BUILDING MEP RENEWAL
RECORD 02 — ETİLER
"AC and underfloor heating were solved in the same project. Before the walls were closed they sent a photographed line report — everything is on record."
Deniz Acar
RESIDENTIAL MECHANICAL
FIELD REPORT · 06 — SURVEY

Let's survey.
Measure, write.

You receive a written preliminary report after the survey.